 
Ouganda
2014
Groupe BRL
  Contexte
              Choosing a public investment in a water treatment plant on the basis of life cycle costs.
Compétences / Outils
              Drinking water
Cost-benefit analysis
Détails
              The objective of the study is to arbitrate between the economic and financial parameters of nine potential plant sites of equal technicality. Economic study in two stages: 
• Life cycle cost analysis of the 9 scenarios and selection of the selected scenario for phase 2
• Economic and financial analysis of the selected scenario
 
 
 
   
   
   
			